List of locating place

Total capacity approximately1,800KwKanto region 4 sites
Total capacity approximately9,600KwHokuriku/Chubu region 4 sites
Total capacity approximately8,600KwKinki region 3 sites
Total capacity approximately6,800KwKyushu region 5 sites
Total capacity approximately9,600Kw
hokkaido/Tohoku region
University of Tohokufukushi, Okura power plant




- Expected electric power generationApproximately 1,988,938kwh(Standard home: About 350 households)
- Reduction in CO2Approximately 630t(Plantation: approximately 45,000 Japanese cedars)
- Reduction in oilApproximately 450t(Approximately 2,300drums)
Interconnection | Sep-13 |
---|---|
Address | Ittupongi Aoba-ku Sendai-city, Miyagi |
Installed site | Idle land owned by university |
Panel | GRID Polycrystalline (230W) Total: 1,803kw |
Max output | 1,500kw |
Annual expected electric power generation | Approximately 1,988,938kwh |
Kanto region
DMM solar Kasama No1. power plant




- Expected electric power generationApproximately 2,630,211kwh(Standard home: About 350 households)
- Reduction in CO2Approximately 830t(Plantation: approximately 45,000 Japanese cedars)
- Reduction in oilApproximately 600t(Approximately 3,000drums)
Interconnection | Sep-15 |
---|---|
Address | Taira-cho Sakama-city, Ibaraki |
Installed site | Idle land |
Panel | Hanwha Polycrystalline(255W) Total: 2,399kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,630,211kwh |
DMM,solar Kasama No.2 power plant




- Expected electric power generationApproximately 2,630,211kwh(Standard home: About 350 households)
- Reduction in CO2Approximately 830t(Plantation: approximately 45,000 Japanese cedars)
- Reduction in oilApproximately 600t(Approximately 3,000drums)
Interconnection | Sep-15 |
---|---|
Address | Taira-cho Sakama-city, Ibaraki |
Installed site | Idle land |
Panel | Hanwha Polycrystalline(255W) Total: 2,399kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,630,211kwh |
DMM solar Kamitakane power plant




- Expected electric power generation約2,559,888kwh(Standard house: About 450 households)
- Reduction in CO2Approximately 810t(Plantation: approximately 58,000 Japanese cedars)
- Reduction in oilApproximately 580t(Approximately 2,900drumns)
Interconnection | Dec-15 |
---|---|
Address | Kamitakane Ichihara-city, Chiba |
Installed site | Idle land |
Panel | Hanwha Polycrystalline(260W) Total:2,400kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,559,888kwh |
DMM solar Takasaki power plant



- Expected electric power generationApproximately 2,851,322kwh(Standard home: About 510 households)
- Reduction in CO2Approximately 900t(Plantation: approximately 64,000 Japanese cedars)
- Reduction in oilApproximately 650t(Approximately 3,200drums)
Interconnection | Jun-16 |
---|---|
Address | Sumomogatakehara Kurabuchimachigonda Takasaki-city, Gunma |
Installed site | Idle land |
Panel | Iwatec Polycrystalline(265W) Total: 2,374kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,851,322kwh |
Hokuriku/Chubu region
DMM solar Kaga power plant




- Expected electric power generationApproximately 1,400,133kwh(Standard house: About 250 households)
- Reduction in CO2Approximately 440t(Plantation: approximately 31,000Japanese cedars)
- Reduction in oilApproximately 320t(Approximately 1,600drums)
Interconnection | Apr-13 |
---|---|
Address | Misaki-cho Kaga-city, Ishikawa |
Installed site | Rooftop of storage |
Panel | GRID Polycrystalline (182W-230W) Total: 1,485kw |
Max output | 1,454.2kw |
Annual expected electric power generation | Approximately 1,400,133kwh |
DMM solar: Akiha power plant




- Expected electric power generationApproximately 2,211,030kwh(Standard house: approximately 390 households)
- Reduction in CO2Approximately 700t(Plantation: approximately 50,000Japanese cedars)
- Reduction in oilApproximately 500t(Approximately 2,500drums)
Interconnection | Apr-15 |
---|---|
Address | Gawagasawa Akiha-ku Nigata-city, Nigata |
Installed site | Idle land |
Panel | Hanwha Polycrystalline(255W) Total: 2,777kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximitely2,211,030kwh |
DMM solar: Kahoku power plant



- Expected electric power generationApproximately 2,454,467kwh(Standard house: Approximately 430 households)
- Reduction in CO2Approximately 770tPlantation: approximately 50,000Japanese cedars
- Reduction in oilApproximately 560tApproximately 2,800 drums
Interconnection | Apr-15 |
---|---|
Address | Numai Kahoku-city, Ishikawa |
Installed site | Idle land |
Panel | Hanwha Polycrystalline(255W) Total: 2,436kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,454,467kwh |
DMM solar: Tamadate power plant




- Expected electric power generationApproximately 2,622,768kwh(Standard house: Approximately 460 households)
- Reduction in CO2Approximately 830t(Plantation: approximately 59,000Japanese cedars)
- Reduction in oilApproximately 600t(Approximately 3,000 drums)
Interconnection | Sep-15 |
---|---|
Address | Shimizu-cho Tamadate Hakuigun, Ishikawa |
Installed site | Idle land |
Panel | Hanwha Polycrystalline(260W) Total: 2,424kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,622,768kwh |
Kinki region
DMM solar Meiwacho No1 power plant




- Expected electric power generationApproximately 2,943,395kwh(Standard house: Approximately 520 households)
- Reduction in CO2Approximately 930t(Plantation: approximately 66,000 Japanese cedars)
- Reduction in oilReduction in oil(Approximately 3,300 drums)
Interconnection | Sep-14 |
---|---|
Address | Showacho takigun, Miwa |
Installed site | Idle land |
Panel | JINKO Polycrystalline(255W) Total: 2,570kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,943,395kwh |
DMM solar Meiwacho No2. power plant




- Expected electric power generationApproximately 2,747,551kwh(Standard house: Approximately 490 household)
- Reduction in CO2Approximately 860t(Plantation: Approximately 62,000 Japanese cedars)
- Reduction in oilApproximately 620t(Approximately 3,100drums)
Interconnection | Sep-14 |
---|---|
Address | Towaco takigun, Miwa |
Installed site | Idle land |
Panel | JINKO Polycrystalline(255W) Total: 2,399kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,747,551kwh |
DMM solar Nagahama power plant



- Expected electric power generationApproximately 1,886,415kwh(Standard house: Approximately 330 houses)
- Reduction in CO2Approximately 590t(Plantation: Approximately 42,000 Japanese Cedars)
- Reduction in oilApproximately 430t(Approximately 2,100 drums)
Interconnection | Mar-15 |
---|---|
Address | Yogocho Nagahama-city, Shigaken |
Installed site | Idle land |
Panel | Apollo Monocrystalline (305W) Total: 1,793kw |
Max output | 1,500kw |
Annual expected electric power generation | Approximately 1,886,415 |
Kyusyu region
DMM solar Kawasaki-cho power plant




- Expected electric power generationApproximately 1,862,080kwh(Standard house: Approximately 330 houses)
- Reduction in CO2Approximately 590t(Plantation: Approximately 42,000 Japanese cedars)
- Reduction in oilApproximately 420t(Approximately 2,100drums)
Interconnection | Apr-13 |
---|---|
Address | Tahara kawasaki-cho tagawa-gun, Fukuoka |
Installed site | town-owned land |
Panel | GRID Polycrystalline (182W) Hanwha Polycrystalline (260W) Total: 1,784kw |
Max output | 1,490kw |
Annual expected electric power generation | Approximately 1,862,080kwh |
DMM solar Meiseizi power plant




- Expected electric power generationApproximately 2,731,528kwh(Standard house: Approximately 480 households)
- Reduction in CO2Approximately 860t(Plantation: Approximately 61,000 Japanese cedars)
- Reduction in oilApproximately 620t(Approximately 3,100drums)
Interconnection | Jan-14 |
---|---|
Address | Meseiji Izuka city, Fukuoka |
Installed site | Idle land |
Panel | GRID Polycrystalline (182W・263W) Total: 2,453kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,731,528kwh |
DMM soar Kaharamachi power plant




- Expected electric power generationApproximately 1,795,647kwh(Standard house: Approximately 320 households)
- Reduction in CO2Approximately 560t(Plantation: Approximately 40,000 Japanese cedars)
- Reduction in oilApproximately 410t(Approximately 2,000 drums)
Interconnection | Nov-14 |
---|---|
Address | Kaharumachi Tagawa-gun, Fukuoka |
Installed site | Town-owned land/Idle land |
Panel | Hanwah Polycrystalline (250W) Total: 554kw |
Max output | 1,490kw |
Annual expected electric power generation | Approximately 1,795,647kwh |
DMM solar Kikuchi power



- Expected electric power generationApproximately 2,393,724kwh(Standard house: Approximately 420 households)
- Reduction in CO2Approximately 750t(Plantation: Approximately 54,000 Japanese cedars)
- Reduction in oilApproximately 540t(Approximately 2,700 drums)
Interconnection | Jun-15 |
---|---|
Address | Kyokushibenri Kikuchi-city, Kumamoto |
Installed site | Idle land |
Panel | Hanwah Polycrystalline (255W) Total: 2,064kw |
Max output | 1,990kw |
Annual expected electric power generation | Approximately 2,393,724kwh |
DMM solar Koshi power plant




- Expected electric power generationApproximately 2,006,229kwh(Standard house: Approximately 360 households)
- Reduction in CO2Approximately 630t(Plantation: Approximately 45,000 Japanese cedars)
- Reduction in oilApproximately 460t(Approximately 2,300drums)
Interconnection | Dec-15 |
---|---|
Address | Takabagohonmatsu, Koshi-city, Kumamoto |
Installed site | Idle land |
Panel | Hanwah Polycrystalline (260W) Approximately 731kw |
Max output | 1,490kw |
Annual expected electric power generation | Approximately 2,006,229kwh |